wjpa wjpa
  • About
  • Portfolio
  • Contact
  • About
  • Portfolio
  • Contact

Browse All

Walter Reed National Military Medical Center

WJPA developed a demolition plan for the Phase I hospital renovations. Specifically, the plan allowed the contractor to separate several buildings to be demolished from the active operating hospital. This included the demolition of a four-story connector structure that was suspended above the facility that was to remain operational.

Walter Reed National Military Medical Center

Walter Reed National Military Medical Center

WJPA developed a demolition plan for the Phase I hospital renovations. Specifically, the plan allowed the contractor to separate several buildings to be demolished from the active operating hospital. This included the demolition of a four-story connector structure that was suspended above the facility that was to remain operational.

Gas South District

Our office was instrumental in developing a demolition plan for a 200-foot-long pedestrian bridge that avoided damage to an adjacent building. In addition, we provided demolition and shoring plans for the partial removal of existing structure at the Gas South Convention Center to allow for a new facility renovation.

Gas South District

Gas South District

Our office was instrumental in developing a demolition plan for a 200-foot-long pedestrian bridge that avoided damage to an adjacent building. In addition, we provided demolition and shoring plans for the partial removal of existing structure at the Gas South Convention Center to allow for a new facility renovation.

Hartsfield Jackson Atlanta International Airport

WJPA performed as a structural demolition consultant to the joint venture construction team on the HJAIA Terminal Modernization project. WJPA designed the demolition plans of various existing structural elements to facilitate the construction of the new covered canopies.

Hartsfield Jackson Atlanta International Airport

Hartsfield Jackson Atlanta International Airport

WJPA performed as a structural demolition consultant to the joint venture construction team on the HJAIA Terminal Modernization project. WJPA designed the demolition plans of various existing structural elements to facilitate the construction of the new covered canopies.

Georgia World Congress Center Parking

WJPA served as the structural demolition consultant for the removal of a circulation structure immediately adjoining an existing parking deck at the Georgia World Congress Center. This demolition was performed to make room for a future hotel to be constructed on the site. Our office designed the shoring and sequencing of the demolition which included destressing and restressing post-tensioning tendons.

Georgia World Congress Center Parking

Georgia World Congress Center Parking

WJPA served as the structural demolition consultant for the removal of a circulation structure immediately adjoining an existing parking deck at the Georgia World Congress Center. This demolition was performed to make room for a future hotel to be constructed on the site. Our office designed the shoring and sequencing of the demolition which included destressing and restressing post-tensioning tendons.

Federal Office Building

WJPA served as the structural demolition consultant on the $200M+ renovation of a Federal Office Building for the Federal Reserve Board. Our office evaluated the existing building for demolition equipment, composed detailed demolition plans for proper sequencing, designed temporary shoring for building components and provided design consulting for building repairs and modifications. We served as a consultant for the demolition contractor, structural steel fabricator, and the general contractor in various professional capacities.

Federal Office Building

Federal Office Building

WJPA served as the structural demolition consultant on the $200M+ renovation of a Federal Office Building for the Federal Reserve Board. Our office evaluated the existing building for demolition equipment, composed detailed demolition plans for proper sequencing, designed temporary shoring for building components and provided design consulting for building repairs and modifications. We served as a consultant for the demolition contractor, structural steel fabricator, and the general contractor in various professional capacities.

Australian Embassy

Our office evaluated the existing Australian Embassy structure, located in Washington DC, to determine if it could safely support various pieces of demolition equipment during building removal. The demolition of this structure required the use of remote-controlled demolition robots on elevated levels and a high reach demolition excavator to remove concrete and steel girders up to 4” thick. Temporary shoring was also designed to facilitate new construction on the site.

Australian Embassy

Australian Embassy

Our office evaluated the existing Australian Embassy structure, located in Washington DC, to determine if it could safely support various pieces of demolition equipment during building removal. The demolition of this structure required the use of remote-controlled demolition robots on elevated levels and a high reach demolition excavator to remove concrete and steel girders up to 4” thick. Temporary shoring was also designed to facilitate new construction on the site.

wjpa