Our office was instrumental in developing a demolition plan for a 200-foot-long pedestrian bridge that avoided damage to an adjacent building. In addition, we provided demolition and shoring plans for the partial removal of existing structure at the Gas South Convention Center to allow for a new facility renovation.

[vc_post_footer box_button="url:%2Fresources%2F|title:Back%20to%20Resources"]