WJPA served as the structural demolition consultant for the removal of a circulation structure immediately adjoining an existing parking deck at the Georgia World Congress Center. This demolition was performed to make room for a future hotel to be constructed on the site. Our office designed the shoring and sequencing of the demolition which included destressing and restressing post-tensioning tendons.
[vc_post_footer box_button="url:%2Fresources%2F|title:Back%20to%20Resources"]