WJPA developed a demolition plan for the Phase I hospital renovations. Specifically, the plan allowed the contractor to separate several buildings to be demolished from the active operating hospital. This included the demolition of a four-story connector structure that was suspended above the facility that was to remain operational.
[vc_post_footer box_button="url:%2Fresources%2F|title:Back%20to%20Resources"]